![]() | ||
Lotus | ||
---|---|---|
Manufacturer | Sakura Sun (SASU) | |
Size | Medium (2) | |
Type | Civilian (A) | |
UEC cost | 44,650 UEC |
The Sakura Sun Lotus is a size 2 grade A civilian power plant.[1]
![]() | ||
Lotus | ||
---|---|---|
Manufacturer | Sakura Sun (SASU) | |
Size | Medium (2) | |
Type | Civilian (A) | |
UEC cost | 44,650 UEC |
The Sakura Sun Lotus is a size 2 grade A civilian power plant.[1]